Salient Features of Flyash Bricks

Salient Features

- High Strength
- Eco friendly
- Low water absorption
- Dimensional accuracy
- Durable
- Low density

Tuesday, November 25, 2014

Standard Size of Flyash Brick In India

Standard Size of lyash Brick In India is



Length*Width*Height = 230*110*75 MM.

Manufacturing Process of Flyash Bricks

MANUFACTURING PROCESS:

Fly ash (60%),
Lime (10%),
Gypsum (5%) and,
Crusher Dust (15%) are manually feed into a pan mixer where water is added to the required proportion for homogeneous mixing. The proportion of raw material may vary depending upon quality of raw materials. After mixing, the mixture are allowed to belt conveyor through feed in to automatic brick making machine were the bricks are pressed automatically. Than the bricks are placed on wooden pallets and kept as it is for two days there after transported to open area where they are water cured for 10 -15 days. The bricks are sorted and tested before dispatch.

Flow Chart of Manufacturing Process of Flyash Bricks

Fly Ash + Gypsum + Lime + Crusher Dust
↓ ↓ ↓ ↓
---------------------------------------------------------------------------------
Weighing
Pan Mixer
Conveyor
Fly Ash Brick Making Machine
(Hydralic (or) Power Press)
Transported To Wooden Racks
Kept as it is
for two days for setting
Water Curing
(7 to 10 days)
Drying
(one or two days)
Sorting and Testing
Dispatch

Sunday, November 23, 2014

Uses Of Flyash Bricks

Uses Of Flyash Bricks

  1. Construction of malls.
  2. Commercial buildings.
  3. Residential buildings.
  4. Wall Any.

Thursday, November 13, 2014

Test flyash bricks before buy

Test following before buy fly ash bricks

Water absorb Less then 10 %

Compresive strength More then 6 N/sq.mm


Weight, Size, dryness, Not Removing material by rubbing thumb on the brick surface.

Fly ash bricks material ratio and timing to mixture

Fly ash bricks material ratio and timing to mixture

First  mix                Lime                          10% Less then 1 minute
Then Second         Gypsum                     5%   Less then 1 minute
Then Third             Stone Dust                 30% 2-3 minute
Last                        Fly ash                       55% 2-3 minute

Then add water according requirement...